Q) A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:Â
a) 9 1/5 days      b) 9 2/5 days       c) 9 3/5 days       d) 10 days
Ans:
A’s 1 day’s work = 1/16
B’s 1 day’s work = 1/12
â´ (A + B)’s 1 day’s work = 1/16 + 1/12 = 7/48
â´ (A + B + C)’s 1 days work = 1/4
â´ C’s 1 day’s work = 1/4-7/48 = 5/48
â´ Time taken by C alone to finish whole work = 48/5 = 9 3/5 days
Hence, Answer is [C].